Always Check
Pattern Prior
To Beginning
Installation! |
1.
Check pattern
FIRST! |
|
| |
|
|
 |
2. Tape one
edge of the template to the installation surface with
masking tape and unroll it. Level the template and tape
the other edge to the installation surface. |
| |
|
|
 |
3. Drill 1/4"
holes 3 inches deep where indicated on our template.
Remove the template and clean out all drill holes using
any of the following methods: a quick puff of air; using
the vents on your drill; compressed air or a turkey baster.
|
| |
|
|
 |
4.
Insert the studs into the stud holes on the
back of each letter. Now fill the drill holes in the wall of
the first letter with silicone. |
| |
|
|
 |
5.
Push the tube of silicone over each stud on
the first letter in order to evenly coat it with adhesive. |
| |
|
|
 |
6.
Push the letter into the drill holes using a
shim to assure the proper standoff of the letter from the
wall. Repeat steps 3 through 5 for the rest of the letters. |
| |
|
|